MBP provided enhanced commissioning services during the design, construction and acceptance phases. The Arts Center is a 70,290-square-foot, campus-wide destination for the study and production of the arts at Duke. The new facility provides space/studios for painting, ceramics, 3D studio/multipurpose studio, video production, dance technology/rehearsal, multipurpose dance studios, general production/rehearsal space, darkroom, printmaking/photo, screen printing room,… Read More
MBP is providing enhanced commissioning services in accordance with USGBC LEED guidelines for New Construction, Energy & Atmosphere (EA) Prerequisite 1: Fundamental Commissioning and EA Credit 3: Enhanced Commissioning during the design, construction, acceptance, and warranty phases. MBP also acted as the LEED consultant being responsible for leading and managing the LEED process on behalf… Read More
MBP provided dispute resolution services including reviewing and providing opinions on the claimed schedule delays and costs, and providing support to counsel in preparation for and at mediation. The power plant project involved the fabrication of a zero liquid discharge process system for Progress Energy.
MBP provided design development and 100% construction document constructibility review services on the project. Project Infinity is a two-story, 169,280-gross-square-foot administrative and clinical laboratory facility. The facility consists of structural steel frame, elevated concrete deck, architectural pre-cast concrete panels, fixtures, furnishings and laboratory equipment.
When Lincoln Financial Group began to look at their physical office space and the properties they have inherited over a series of mergers and acquisitions, they realized they had a special challenge with the Jefferson Life office building in downtown Greensboro, North Carolina. Registered as a historical property, the building was a towering skyscraper of… Read More
MBP provided construction engineering and inspection services for NCDOT on an as-needed, on-call basis throughout the state of North Carolina. All work under this contract is performed in accordance with all applicable guidelines published by the state and in accordance with the scope of work. Projects under this on-call contract included new construction and maintenance… Read More
MBP provided dispute resolution services for this design-build project which included the replacement of the bridge that carries I-85 over the Yadkin River, the parallel bridges that cross over the North Carolina Railroad tracks located north of the river, the parallel bridges over the Duke Power Industrial Rail Spur located south of river, and the bridge… Read More
MBP performed independent cost estimates on behalf of North Carolina State University under an on-call task-order contract. The projects estimated under this task-order agreement included the 1911 Building, Greek Village Phase I, Partners II, and Thompson Theater. 1911 Building The project consisted of the renovation of an existing 48,500-square-foot building originally constructed in 1911 to include new faculty… Read More
On behalf of the North Carolina Department of Transportation, MBP reviewed the contractor’s claim for additional compensation and time extension. The Virginia Dare Bridge is a new 8.4 kilometer structure that connects Roanoke Island and North Carolina’s Barrier Islands in Dare County, North Carolina. The project spans wetland areas near the shore on the east and west sides… Read More
MBP provided enhanced commissioning of the building energy systems for compliance with the North Carolina Senate Bill 668 and USGBC LEED Energy & Atmosphere Prerequisite 1 and Credit 3. This state-of-the-art student center project included 173,041 gross square feet of additions to the existing facility, and renovations to the existing 117,421-square-foot building. The project included demolition… Read More