MBP’s initial task included providing a parametric, AACE International Class 4 estimate with updates to the project team as the design developed. The design team was preparing bridging documents which was utilized in the procurement of a design-build firm to complete the project. After the design-build team was selected, MBP was retained, as part of… Read More
MBP performed dispute resolution services including the investigation and technical analysis of disputed issues and delays related to the new 2,700-space, multi-level parking garage and connecting tunnel at the Raleigh-Durham International Airport. Phased construction included two concrete deck structures consisting of slab-on-grade, four supported levels of post-tensioned concrete, two steel vehicular helices, and a covered open-air lightwell… Read More
MBP provided construction management services for this signature seven-acre park site which includes features such as a large fountain, outdoor performance space, and open lawn areas. The 42-foot in diameter fountain, the primary feature of the park, is fed from a pump house which contains the pumps as well as the controls for the plumbing… Read More
MBP provided the Town of Hope Mills with litigation support and owners representative services on the first design-build dam in North Carolina. The Hope Mills Dam breached in June 2010, approximately 18 months after its completion. The new dam is a five-cycle reinforced concrete labyrinth dam on engineered fill. Additional features include lake bed clearing, a… Read More
MBP provided CPM schedule analysis services through an open-ended service agreement with the University of North Carolina at Charlotte. Projects included the EPIC Center, the Jerry Richardson Stadium, the South Village Program, the Hunt Residence Hall, and the South Village Dining Hall. EPIC Center The three-story EPIC Center consisted of approximately 200,000 square feet of… Read More
MBP provided commissioning services of this new two-story, 101,563-square-foot elementary school prototype designed to meet a capacity of 800 students.
MBP provided commissioning services for this new two-story, 93,855-square-foot elementary school prototype designed for a capacity of 780 students.
MBP provided enhanced commissioning services in accordance with USGBC LEED guidelines for New Construction, Energy & Atmosphere Credit 3. The project involved the construction of a new 87,310-square-foot academic building with library, classrooms and tutorial labs, conference rooms, and administrative offices. The project also constructed a new 9,000-square-foot regional plant that provides chilled and heated… Read More