MBP provided commissioning services for the new Mary M. Torggler Fine Arts Center at Christopher Newport University. Serving the Christopher Newport community, Hampton Roads and all of Virginia, the Mary M. Torggler Fine Arts Center cultivates extraordinary encounters with the visual arts. Whether viewing an exhibition, taking a class, or attending a lecture or gallery… Read More
The Hampton Virginia Aquaplex is the largest competitive aquatic facility in Virginia and the largest between Washington, DC, and Greensboro, NC. MBP provided construction management services, and our involvement covered the entire lifecycle of the project, from technical support on the design-build process to construction support, which included our careful attention to detail and verifying… Read More
MBP provided construction management services including materials testing and inspection, CPM scheduling, cost estimating, and drone photography for the Hal and Berni Hanson Regional Park. To honor the Hanson family name, Loudoun County set forth to design and construct a park that included something for everyone and for all ages that would attract residents from all… Read More
MBP has been providing construction management services to Chesterfield County Public Schools in the support of new school construction and renovations throughout the County. MBP’s relationship with CCPS began in June of 2016 when MBP was selected to provide CM services for new school construction, renovations, and additions as identified in the County’s 2013 Bond… Read More
MBP was responsible for pre-construction, construction, and post construction phase project management operations including constructability reviews, independent design estimates, scoping documents, change management, managing project stakeholders, on-site QA/QC, and virtual documentation of the project. The Education Center Reuse project included the renovation of an existing two-and a-half acre campus which housed a curved, five story, 55,169-square-foot… Read More
MBP provided pre-construction and construction phase services including project management, constructibility review, cost estimating, value engineering, on-site construction management, CPM schedule review, and commissioning. MBP also provided administration of the Federal EDA funding grant. The Virginia Tech Seafood AREC is a new three-story, more than 15,000-square-foot research facility along the waterfront in downtown Hampton. The… Read More
MBP provided Construction Manager Advisor services to include overall construction management oversight of the project, teaming with and advising Arlington Public Schools on the progress of the project, scheduling, project management, estimating services, and supervising third party inspection services required by Arlington County during the design and construction phases of the project. The project involved… Read More
MBP provided commissioning services in accordance with ASHRAE Guidelines and the Building Commissioning Association Handbook. The project involved the construction of a new, approximately 315,000-square-foot high school. Included in the program were educational classrooms, administrative spaces, dining commons, an auditorium and theater, functional trade labs, scientific research labs, a greenhouse, and medical/veterinary training areas. Opening in… Read More
MBP provided construction management and inspection services for the Dominion Boulevard Improvement project, the largest locally administered project in the Commonwealth of Virginia. This project transformed a two-lane road into a four-lane limited access, divided, toll highway composed of three new grade-separated interchanges and a twinspan bridge, crossing the Elizabeth River and Atlantic Intracoastal Waterway…. Read More
MBP supported Williamsburg-James City County Public Schools with construction management and commissioning services for this 21st century educational facility. The James Blair Middle School project consisted of a partial demolition to the 88,939-square-foot, two-story existing building and detached building to construct a new building on the James Blair parcel. Phase 1A repurposed the classroom wing… Read More