MBP provided expert witness analysis and testimony services for the new 680 megawatt electric generation power plant including three combustion turbines capable of running by both natural gas or diesel fuel and all utility and plant infrastructure.
MBP provided expert witness analysis and testimony services for the new 680 megawatt electric generation power plant including three combustion turbines capable of running by both natural gas or diesel fuel and all utility and plant infrastructure.
MBP has been involved in all aspects of the Dulles Corridor Metrorail Project, also known as the Silver Line, as part of the project management support services team, including management of Phase 1 task orders to complete the punchlist, construction support for both Packages A and B, project controls support including a scheduler and several… Read More
MBP provided project management support services, building commissioning, and on-site resident project representative services, including cost estimating, constructibility review, on-site project inspection, and after federal funds were made available during construction, developed a Davis-Bacon and Related Acts compliance management plan. The project consisted of the construction of a new 106,000-square-foot elementary school on approximately 20… Read More
MBP provided construction management and commissioning services including change order review and evaluation, CPM scheduling analysis, project management support, program budget controls, and on-site construction project inspection. The project consisted of construction of a new one-story, 106,000-square-foot elementary school on approximately 20 acres of land. The school provides pre-K through fifth grade classrooms, cafeteria, a… Read More
MBP conducted a formal 40-hour value engineering workshop on behalf of Norfolk State University. In addition, MBP provided commissioning services in accordance with the ASHRAE Guidelines and USGBC LEED Energy & Atmosphere 1, Fundemental Commissioning. This project consisted of a new 140,676-square-foot classroom building that included spaces academic and nursing training. The academic spaces for… Read More
MBP conducted a formal 40-hour value engineering workshop utilizing an independent team of architects and engineers. The value engineering study was conducted in accordance with the practices recommended by SAVE International. The Basketball Practice Facility project located at Old Dominion University, is a 23,961-gross-square-foot facility housing the basketball practice and administrative functions for both the… Read More
MBP provided full-time, on-site project inspection services and worked in collaboration with the Old Dominion University staff. This project consisted of a new two-story, 44,000-square-foot dining facility that accommodated both undergraduate students for daily dining and special event meeting functions for the University. The first floor included the main student dining area that featured a… Read More
MBP conducted a formal 40-hour value engineering (VE) workshop utilizing an independent team of architects and engineers. The VE study was conducted in accordance with the practices recommended by SAVE International. The Prince William County Adult Detention Center Phase 2 Expansion project consisted of the construction of a 95,250-gross-square-foot, three-story facility consisting of 204 beds… Read More
MBP reviewed and analyzed project records for the new 201,000-square-foot, two-story Hidden Valley High School. The building consisted of academic classrooms, administrative offices, gymnasium, auditorium, and cafeteria.
MBP provided CPM scheduling services for the development of a preliminary schedule using Primavera P6 CPM scheduling software. The project consisted of the ENR upgrade and expansion project for the wastewater treatment plant.