As part of the program management team, MBP provided assistance to VDOT with independent review and evaluation of contractual documents prior to VDOT executing the comprehensive agreement with the design-build team. Analysis included cost estimating, review of technical requirements, quality assurance program requirements, and other contractual language. During the design and construction phases, MBP provided… Read More
MBP provided part-time clerk of the works services, working in collaboration with VDOT staff, the consultant architect, and the developer, through the pre-construction, construction, and construction closeout phases. The project involved the renovation of an existing three-story unoccupied office building and upgrades to the existing parking lot. The existing building, which was converted to VDOT’s… Read More
MBP provided on-site construction management and inspection services including contract management, documentation control, CPM scheduling, and other support services. The project involved the replacement of an existing 3,000-foot continuous beam bridge on Route 147 Huguenot Road, over the James River, CSXT Railroad, Kanawha Canal, and forested wetlands. Phased construction required the new bridge to be constructed… Read More
MBP provided quality assurance management services during the design and construction phases; and quality assurance inspection and testing, and project records management services during the construction phase. The project consisted of the construction of a new diamond interchange for Route 29/460 and Odd Fellows Road. Project elements included a new bridge over a divided highway,… Read More
MBP provided construction scheduling services for VDOT’s Springfield Interchange project. The final phase of the Springfield Interchange Program involved construction of 14 bridges, including three large fly over structures, numerous ramps, and main line reconstruction of Interstate 395. The project also included traffic management systems and high-mast lighting and required coordination with two adjacent contracts.
MBP provided construction phase quality assurance services on the Zion Crossroads project. This design-build project was located at the interchange of Route 15 and I-64 with the purpose to improve traffic operations and increase safety at the interchange and along Route 15. Improvements made included reconstruction of approximately 0.63 miles of existing roadway to accommodate… Read More
MBP facilitated a formal value engineering workshop utilizing an independent team of architects and engineers to identify value-enhancement ideas on the design development documents. The value engineering study was conducted in accordance with the practices recommended by SAVE International. The Virginia Department of Transportation (VDOT)/Virginia State Police (VSP) Joint Safety Operations Center project is an… Read More
MBP facilitated a formal value engineering workshop utilizing an independent team of architects and engineers to identify value-enhancement ideas on the design development documents. The value engineering study was conducted in accordance with the practices recommended by SAVE International. The new Princess Anne Middle School is a 257,000-gross-square-foot facility for a student population of 1,500… Read More
MBP facilitated a formal value engineering workshop utilizing an independent team of architects and engineers to identify value-enhancement ideas on the design development documents. The value engineering study was conducted in accordance with the practices recommended by SAVE International. The new Thoroughgood Elementary School is a 94,478-gross-square-foot facility for a student population of 700. The… Read More
MBP provided retro-commissioning services to assist in the resolution of HVAC related issues by identifying and evaluating deficiencies in the mechanical systems, that included issues associated with thermal comfort of occupants. This project consisted of a 86,645-square-foot, one-story elementary school that underwent modernization consisting of the renovation of the existing school and the construction of… Read More