MBP reviewed and analyzed project records for the new 201,000-square-foot, two-story Hidden Valley High School. The building consisted of academic classrooms, administrative offices, gymnasium, auditorium, and cafeteria.
MBP reviewed and analyzed project records for the new 201,000-square-foot, two-story Hidden Valley High School. The building consisted of academic classrooms, administrative offices, gymnasium, auditorium, and cafeteria.
MBP analyzed delays in the construction, commissioning, and start-up of a 551 mega-watt Integrated Gasification Combined Cycle (IGCC) power plant and provided expert witness testimony to an International Chamber of Commerce arbitration tribunal. The plant was constructed within the confines of the Saras Refinery and used residuals from the oil refining process to generate electricity. In… Read More
MBP provided dispute resolution services including expert testimony and litigation support. The project involved three high-end apartment style college housing buildings situated on a 7.7 acre site including one four-story building with 197 units and a clubhouse; two four-story buildings with 28 unit, a pavilion, and a structured parking deck; and amenities such as a… Read More
MBP provided the Town of Hope Mills with litigation support and owners representative services on the first design-build dam in North Carolina. The Hope Mills Dam breached in June 2010, approximately 18 months after its completion. The new dam is a five-cycle reinforced concrete labyrinth dam on engineered fill. Additional features include lake bed clearing, a… Read More
MBP provided claims and dispute resolution support services for the John and Frances Angelos Law Center. The project involved the construction of a new 190,000-square-foot, 12-story law school building to house the University of Baltimore’s clinical services and academic program, and included a central atrium featuring natural light, greenery, and water features, 300-seat moot courtroom,… Read More
MBP provided dispute resolution services for the construction UMB’s new, 10-story, 360,000-square-foot dental school in downtown Baltimore. The building houses the school of dentistry, academic classrooms, oral health care facilities, and dental research facilities. The project also includes two illuminated atrium areas, advanced dental education clinics, diagnostic and surgical services, pre-clinical teaching labs, student research… Read More
MBP provided dispute resolution services for the U.S. Army Corps of Engineers Analytical Chemistry Laboratory which consisted of the construction of two additions comprising a total of 26,000 square feet, including a state-of-the-art advanced analytical chemistry wing for work with supertoxic chemical agents and toxins and associated data reduction space and administrative space.
MBP provided dispute resolution services for the U.S. Army Corps of Engineers for the construction of a state-of-the-art, 88,000-square-foot criminal forensic laboratory. The laboratory included offices, laboratory areas, an indoor firing range, evidence storage, locker rooms, shower facilities, and mission support areas such as a hazardous waste holding facility and a training conference room.
MBP provided project management, construction management, project controls, contract administration, and quality assurance on this integrated design-bid-build project. In addition, MBP provided dispute resolution services including an analysis of the as-planned compared to the latest schedule updates. The new Lincoln Hall provides 450,000 square feet of academic building for the National Defense University at Fort McNair, Washington, DC…. Read More
MBP provided an independent analysis of the claims made by the general and the electrical prime contractors against the school district. The project involved a structural steel building with a total area of 126,000 square feet on three levels. It was designed in accordance with LEED guidelines for green buildings, utilizing energy efficient ground source heat pumps for… Read More