MBP provided program and full-time, on-site construction management services, site inspections, utilities coordination, progress monitoring and reporting to school board, CPM scheduling review, and change order and payment application review. The project involved the construction of a new 100,000-square-foot elementary school with a design capacity for 900 students. The one-story brick veneer school includes three… Read More
MBP provided program and full-time, on-site construction management services, site inspections, utilities coordination, progress monitoring and reporting to school board, CPM scheduling review, and change order and payment application review. The project involved the demolition of the existing 1930 school house and the construction of a new 90,000-square-foot elementary school with a design capacity for… Read More
MBP provided commissioning services during the construction, training, warranty/post-acceptance, and final document phases. The new facility replaced an existing building and provides a new 53,000-square-foot science and classroom building. It was constructed in a single phase and includes office space, science and research laboratories, smart classrooms, a digital planetarium, and an amphitheater. This project achieved… Read More
MBP provided commissioning services on an as-needed basis during the contract term. This project involved the construction of a new 113,000-square-foot addition to the existing Integrated Science Center (ISC) Phase 1 and ISC Phase 2. The project included spaces for applied science, biology, chemistry, psychology, and integrated research. Spaces also include laboratories, classrooms, offices, a lecture… Read More
MBP provided program management services including cost management and cost engineering services. Hurricane Katrina caused extensive wind damage and the failure of the London Avenue Canal flooded the Dillard University campus. The canal failure produced massive flood damage to campus infrastructure. The project included renovation and demolition of more than 30 buildings across Dillard University’s… Read More
MBP provided enhanced commissioning services as described in USGBC’s LEED for New Construction Version 3.0, Energy & Atmosphere Prerequisite 1 and Credit 3 during the design, construction, acceptance, and warranty phases. The Duke Hollows Residence Halls project consisted of two dormitories totaling 264,700 square feet. The six-story buildings each house 703 beds and include two… Read More
MBP provided enhanced commissioning services during the design, construction and acceptance phases. The Arts Center is a 70,290-square-foot, campus-wide destination for the study and production of the arts at Duke. The new facility provides space/studios for painting, ceramics, 3D studio/multipurpose studio, video production, dance technology/rehearsal, multipurpose dance studios, general production/rehearsal space, darkroom, printmaking/photo, screen printing room,… Read More
MBP is providing enhanced commissioning services in accordance with USGBC LEED guidelines for New Construction, Energy & Atmosphere (EA) Prerequisite 1: Fundamental Commissioning and EA Credit 3: Enhanced Commissioning during the design, construction, acceptance, and warranty phases. MBP also acted as the LEED consultant being responsible for leading and managing the LEED process on behalf… Read More
MBP provided owner representative services, including coordinating a value engineering workshop, for the new Education and Academic Administration Building at Eastern Virginia Medical School (EVMS). The new 11-story, 149,000-square-foot building includes a 310-space parking garage for the M1, M2, and Medical Masters programs and their staff as well as consolidating numerous academic support departments currently… Read More
MBP provided commissioning services for this new building from design through occupancy phases. The new 180,000-square-foot building for the Volgenau School of Information Technology and Engineering contains 80,000 square feet of academic space including classrooms and administrative offices and 80,000 square feet of research space and laboratories. An additional 20,000 square feet of space is allocated for… Read More