MBP provided commissioning services during the design, construction, acceptance, and occupancy phases. The project involved the three-story, 54,000-gross-square-foot Aquia Data Center, a state-of-the-art, secure data center with offices, meeting rooms, computer labs, and language labs.
MBP provided commissioning services from the design phase through the construction phase. The project involved a new seven-story, 256,260-square-foot classroom/academic building with a 450-car, three-level parking garage under the building. The building houses multi-tiered classrooms, a 300-seat auditorium, multi-purpose room, computer laboratory, faculty offices, a library, and a television production studio with editing suites. This… Read More
MBP provided commissioning services from the design phase through the occupancy phase. This four-story, 84,669-square-foot performing arts center features a reception space, an art gallery, and two theaters: the 1,166-seat Merchant Hall and the 300-seat Gregory Family Theater. Other spaces include a patron’s lounge; scene, paint, and costume shops; dressing rooms; catering kitchen; administrative offices;… Read More
MBP provided design and construction phase commissioning services in accordance with USGBC LEED guidelines for New Construction, Energy & Atmosphere (EA) Prerequisite 1: Fundamental Commissioning and EA Credit 3: Enhanced Commissioning. The project included a new two-story, 105,951-square-foot prototype elementary school. “I appreciate the effort of all team members and highlight their extra effort to unite… Read More
MBP provided CPM scheduling services and design, construction, acceptance, and warranty phase commissioning services for the new high school. The project involved the construction of a new, approximately 275,000-square-foot high school situated on 45 acres. The project included the incorporation of design and building practices that enhance the educational environment, energy efficiency, and sustainability of… Read More
MBP provided commissioning services in accordance with USGBC LEED guidelines, Energy & Atmosphere (EA) Prerequisite 1: Fundamental Commissioning and EA Credit 3: Enhanced Commissioning for the modernization of the elementary school. This project involved a new 83,488-square-foot addition to the kindergarten through fifth grade school building with a 662-student capacity, which replaced a large part… Read More
MBP provided commissioning services in accordance with USGBC LEED guidelines, Energy & Atmosphere (EA) Prerequisite 1: Fundamental Commissioning and EA Credit 3: Enhanced Commissioning. The project involved the construction of a new replacement high school with demolition of the existing facilities. The building, located at the southwest end of the site, is a three-story facility… Read More
MBP provided project management support services, building commissioning, and on-site resident project representative services, including cost estimating, constructibility review, on-site project inspection, and after federal funds were made available during construction, developed a Davis-Bacon and Related Acts compliance management plan. The project consisted of the construction of a new 106,000-square-foot elementary school on approximately 20… Read More
MBP provided construction management and commissioning services including change order review and evaluation, CPM scheduling analysis, project management support, program budget controls, and on-site construction project inspection. The project consisted of construction of a new one-story, 106,000-square-foot elementary school on approximately 20 acres of land. The school provides pre-K through fifth grade classrooms, cafeteria, a… Read More
MBP provided litigation support leading to two negotiated settlements for the New York Law School’s new community facility. This glass enclosed, 235,000-square-foot, nine-story structure doubles the size of the law school’s campus, and includes classrooms, an auditorium, conference and study rooms, libraries, lounges, a dining facility, administrative, and event and operations space for the New York… Read More