MBP conducted a formal 40-hour value engineering workshop on behalf of Norfolk State University. In addition, MBP provided commissioning services in accordance with the ASHRAE Guidelines and USGBC LEED Energy & Atmosphere 1, Fundemental Commissioning. This project consisted of a new 140,676-square-foot classroom building that included spaces academic and nursing training. The academic spaces for… Read More
MBP performed independent cost estimates on behalf of North Carolina State University under an on-call task-order contract. The projects estimated under this task-order agreement included the 1911 Building, Greek Village Phase I, Partners II, and Thompson Theater. 1911 Building The project consisted of the renovation of an existing 48,500-square-foot building originally constructed in 1911 to include new faculty… Read More
MBP provided enhanced commissioning of the building energy systems for compliance with the North Carolina Senate Bill 668 and USGBC LEED Energy & Atmosphere Prerequisite 1 and Credit 3. This state-of-the-art student center project included 173,041 gross square feet of additions to the existing facility, and renovations to the existing 117,421-square-foot building. The project included demolition… Read More
MBP conducted a formal 40-hour value engineering workshop utilizing an independent team of architects and engineers. The value engineering study was conducted in accordance with the practices recommended by SAVE International. The Basketball Practice Facility project located at Old Dominion University, is a 23,961-gross-square-foot facility housing the basketball practice and administrative functions for both the… Read More
MBP provided full-time, on-site project inspection services and worked in collaboration with the Old Dominion University staff. This project consisted of a new two-story, 44,000-square-foot dining facility that accommodated both undergraduate students for daily dining and special event meeting functions for the University. The first floor included the main student dining area that featured a… Read More
MBP provided commissioning services for the design, bidding, construction, and warranty occupancy phases for the renovation of the existing classroom and laboratory building. The four-story, 39,500-square-foot Kostos Building located on the Penn State University Hazleton Commonwealth Campus provided improvements to the mechanical, electrical, and plumbing systems serving the existing classrooms, laboratories, offices, lecture hall, library, and… Read More
MBP reviewed and analyzed project records for the new 201,000-square-foot, two-story Hidden Valley High School. The building consisted of academic classrooms, administrative offices, gymnasium, auditorium, and cafeteria.
MBP provided construction management services including CPM scheduling, cost estimating, constructibility reviews, on-site contract administration, commissioning, inspections, and project closeout. The new 99,000-square-foot, K-5 elementary school is a single-story building with 32 general classrooms divided into three wings. Each wing contains a teacher center and a commons area designated as a multiple classroom instructional space…. Read More
MBP provided construction management services including CPM scheduling, cost estimating, constructibility reviews, on-site contract administration, commissioning, inspections, and project closeout. This project consisted of a two-story, 97,000-square-foot, 800-student, K-5 elementary school. The 15-acre site was improved to include staff and bus parking, turn lanes, ball fields, water, sanitary sewer, and storm sewer utilities.
MBP provided commissioning services during the design, bidding, construction, and warranty occupancy phases for the renovation of an existing classroom and laboratory building. The project involved renovating the existing two-story, 43,000-square-foot Cannon Laboratory located on the University of Delaware’s satellite campus. The renovation project provided improvements to the mechanical, electrical, and plumbing systems serving the… Read More