In 2019, as a subconsultant to FEA, MBP has assisted with the facility assessments, site investigations, and scoping of deferred maintenance and capital improvement projects at over 31 national parks for over 125 assets across the continental United States, Hawaii, and Alaska. These projects include a mix of facility types, road/street repairs, utility distribution, water/wastewater… Read More
MBP provided construction management support services as the project liaison to executive-level management of the National Mall staff and the Denver Service Center for the Washington Monument Earthquake Damage Repairs project located on the National Mall in Washington, DC. The Washington Monument is a stone masonry obelisk with a total height of 555 feet, 5-1/8 inches…. Read More
MBP provided construction management, quality assurance, move management, safety management, cost estimating, CPM scheduling, and claims analysis services. This project was a result of the 2005 BRAC Commission’s recommendation to realign all tertiary (sub-specialty and complex care) medical services formerly located at Walter Reed Army Medical Center in Washington, DC, to the National Naval Medical… Read More
MBP conducted a formal 40-hour value engineering (VE) workshop utilizing an independent team of architects and engineers. The VE study was conducted in accordance with the practices recommended by SAVE International. The Prince William County Adult Detention Center Phase 2 Expansion project consisted of the construction of a 95,250-gross-square-foot, three-story facility consisting of 204 beds… Read More
MBP provided retro-commissioning services and an ASHRAE Level 2 Energy Audit for the 441,321-gross-square-foot Smithsonian Institute National Museum of the American Indian located in Washington, DC. Museum space consisted of a five-story atrium, exhibit galleries, theaters, cafe with kitchen, museum shops, and office space.
MBP provided construction management services for this signature seven-acre park site which includes features such as a large fountain, outdoor performance space, and open lawn areas. The 42-foot in diameter fountain, the primary feature of the park, is fed from a pump house which contains the pumps as well as the controls for the plumbing… Read More
MBP provided project and construction management support to the owner’s staff responsible for the repairs and alterations of the town’s skating rink building. The project involved the timber structure, originally constructed in 1903, that was purchased by the Town of Purcellville and was in the process of planning repairs and alterations until the structural soundness condemned… Read More
MBP provided a broad range of program management, construction management, engineering technical support, and construction quality assurance tasks. These tasks included assistance and guidance to field offices, construction quality assurance inspection and reporting, review of contract documents and shop drawings, review of network analysis schedules, quality control plans, investigation, and reporting of construction contractor claims…. Read More
MBP provided project management, construction management, project controls, contract administration, and quality assurance on this integrated design-bid-build project. In addition, MBP provided dispute resolution services including an analysis of the as-planned compared to the latest schedule updates. The new Lincoln Hall provides 450,000 square feet of academic building for the National Defense University at Fort McNair, Washington, DC…. Read More
Under an indefinite delivery construction management services contract with the U.S. Army Corps of Engineers, MBP provided schedule and delay analysis services for the North Alabama Area Office. The project included the design and construction of a 839,873-square-foot, six-story reinforced concrete and structural steel building on concrete footings, with pre-cast wall panels and built-up roofs, including… Read More