MBP provided complete construction management and inspection services including quality assurance, quality control, maintenance of traffic, erosion and sediment control compliance, and extensive CPM schedule review. MBP worked with the contractor to develop enhancements to the construction phasing which resulted in significant schedule improvement. Prior to construction, MBP developed pre-bid CPM schedules and performed constructibility review… Read More
As part of the program management team, MBP provided assistance to VDOT with independent review and evaluation of contractual documents prior to VDOT executing the comprehensive agreement with the design-build team. Analysis included cost estimating, review of technical requirements, quality assurance program requirements, and other contractual language. During the design and construction phases, MBP provided… Read More
MBP provided on-site construction management and inspection services including contract management, documentation control, CPM scheduling, and other support services. The project involved the replacement of an existing 3,000-foot continuous beam bridge on Route 147 Huguenot Road, over the James River, CSXT Railroad, Kanawha Canal, and forested wetlands. Phased construction required the new bridge to be constructed… Read More
MBP provided quality assurance management services during the design and construction phases; and quality assurance inspection and testing, and project records management services during the construction phase. The project consisted of the construction of a new diamond interchange for Route 29/460 and Odd Fellows Road. Project elements included a new bridge over a divided highway,… Read More
MBP provided construction scheduling services for VDOT’s Springfield Interchange project. The final phase of the Springfield Interchange Program involved construction of 14 bridges, including three large fly over structures, numerous ramps, and main line reconstruction of Interstate 395. The project also included traffic management systems and high-mast lighting and required coordination with two adjacent contracts.
MBP provided construction phase quality assurance services on the Zion Crossroads project. This design-build project was located at the interchange of Route 15 and I-64 with the purpose to improve traffic operations and increase safety at the interchange and along Route 15. Improvements made included reconstruction of approximately 0.63 miles of existing roadway to accommodate… Read More
MBP facilitated a formal value engineering workshop utilizing an independent team of architects and engineers to identify value-enhancement ideas on the design development documents. The value engineering study was conducted in accordance with the practices recommended by SAVE International. The Virginia Department of Transportation (VDOT)/Virginia State Police (VSP) Joint Safety Operations Center project is an… Read More
MBP provided conceptual estimating services on 10 roadway projects ranging from intersection improvements to a 6.65-mile, two-lane to five-lane roadway widening project. In addition, the project included approximately 1.5 miles of road construction with earthwork, utility relocation, pavement, signals, striping, and coordinating the work on a road that remained in use.